Know whether this site deserves a build.

A viable charging project needs more than land and a charger quotation. We test the demand source, access and parking, electrical dependency, charger mix, commercial model, approval path, capex, and downside case before the project advances.

Screen the plot free Request a feasibility scope

Questions the study answers

  • Who is expected to charge here, at what time, and why at this location?
  • Can vehicles enter, queue, turn, charge, and exit safely?
  • What connected load and transformer range does the concept require?
  • Which AC/DC/LEV configuration fits the demand and dwell time?
  • What utilisation must be achieved to clear operating and investor hurdles?
  • Which assumptions depend on public data, a vendor, you, or field verification?
  • What DISCOM, electrical, fire, land-use, and local approvals must be confirmed?
  • Which operating model — owner-led, CPO, lease, revenue share, or franchise — allocates risk appropriately?

What the feasibility pack contains

  • Site and catchment summary.
  • Visible supply and demand-source analysis.
  • Access, parking, and geometry screen.
  • Connected-load and transformer concept.
  • Charger configurations compared.
  • Site-specific financial model and downside scenarios.
  • Approvals and evidence checklist for the state.
  • Neutral OEM/CPO shortlist where included — we take no commission on it.
  • Decision: proceed, proceed with conditions, hold, redesign, or stop.
  • A list of facts that only a site visit or authority can settle.

What it is not

Remote feasibility is not a measured survey, title opinion, DISCOM sanction, construction drawing, electrical certification, fire approval, lender sanction, vendor quotation, or guarantee of demand. Those belong to later verification and statutory work — the pack tells you which of them your decision still depends on.

Process

  1. Free plot screen in GeoSite.
  2. Intake and document check.
  3. Demand, supply, power, configuration, and financial analysis.
  4. Decision review.
  5. Site visit only if physical facts can change a viable case.

A weak site should fail before the expensive work begins.

Most enquiries do not need a paid engagement. If the free screen says no, that answer is free and final — and it is the product working as intended.