ORR charging corridor analysisResearch beta
Highway corridor screening across Telangana
193Cells on corridor
93Best car score
90Best truck score
127Stations within 5 km
Corridor sites behave differently from urban ones. The model
uses a wider supply radius on corridors (25 km for cars, 30 km for trucks) than
in cities (3 km), because a driver on a highway will divert far further than one in
traffic. A corridor cell scoring lower than an urban one is not necessarily a worse
opportunity — it is being judged against a much larger catchment.
Highest-scoring cells on ORR
| Cell | Car score | Truck score | Centroid |
|---|---|---|---|
| 8860a24a41fffff | 93 | 42 | 17.421, 78.358 |
| 8860a258a7fffff | 92 | 38 | 17.414, 78.370 |
| 8860a24a4dfffff | 90 | 42 | 17.421, 78.366 |
| 8860a24a49fffff | 89 | 40 | 17.413, 78.362 |
| 8860a24a47fffff | 87 | 43 | 17.428, 78.354 |
| 8860a24a05fffff | 86 | 37 | 17.443, 78.345 |
| 8860a24a0dfffff | 85 | 44 | 17.435, 78.349 |
| 8860a2599bfffff | 85 | 37 | 17.421, 78.375 |
These are area centroids at roughly 5.3 km² resolution outside Hyderabad — starting points for investigation, not plots.
Existing public charging along the route
127 station record(s) sit within 5 km of a cell on this corridor.
Operators present: Statiq (86), Tata Power EV Charging Solutions (15), ChargeZone (12), Hindustan Petroleum Corporation (6), Reliance BP Mobility (5), (Unknown Operator) (3).
Electric bus services on this corridor
- Hyderabad to Rajiv Gandhi International Airport — EveyTrans (Pushpak) (40 buses)
Bus charging is a captive depot-and-terminus load contracted to an operator, not walk-in forecourt demand. A corridor carrying e-buses signals a counterparty worth approaching, not passing traffic that will fill your guns.
What still needs verifying
- Traffic — modelled from road class and population, not counted.
- Grid capacity — sanctioned load at a specific plot is unknown. Across Telangana, higher-scoring cells correlate with lower sanctioned capacity (p=0.006), so connection cost and lead time may be worse than the score suggests.
- Land — availability, price and access sit entirely outside the model.
- Real competition — including chargers no public source lists.
Explore the corridor on the map Request a corridor verification